System analysis and design (planning phase c++) CSCI 359 Systems Analysis & Design project Planning Versi

System analysis and design (planning phase c++)

Don't use plagiarized sources. Get Your Custom Assignment on
System analysis and design (planning phase c++) CSCI 359 Systems Analysis & Design project Planning Versi
From as Little as $13/Page

CSCI 359 Systems Analysis & Design

project Planning
Version <0.1>

<09/8/2020>

Project Charter Version:

<1.0>

Prepared by < >

[Insert appropriate Disclaimer(s)]

Revision Date:

Error! Unknown document property name.

Page 2 of 18

CDC_UP_Project_Charter_Template_v1.1.doc

TABLE OF CONTENTS

1

Introduction

3

1.1

Systems Request Summary

3

1.2

Working Environment

3

1.3

Benefits

3

1.4

User Descriptions

3

1.5

Business Case

3

2

principal activities and milestones

3

2.1

Work Breakdown Structure

3

2.2

Project Schedule

3

2.3

Visibility plan

3

3

Project Features

3

4

Assumptions, Constraints And Risks

4

4.1

Assumptions

4

4.2

Constraints

4

4.3

Risks

4

5

Feasibility Study

4

6

Project Roles and Responsibilities

4

6.1

Roles

4

6.2

Responsibilities

4

6.3

Peer Evaluation

5

APPENDIX A: REFERENCES

6

APPENDIX B: KEY TERMS

7

Introduction

Systems Request Summary
[The introduction contains a brief description of the problem that you are solving, its importance, the proposed system, the name of the company or client for whom the work will be done, and the name of the person or group who initiated the investigation.]

Working Environment
[Briefly describe where the system will be used.]

Benefits

[Briefly describe the main benefit of the proposed system then list the detailed benefits.]

User Descriptions
[Identify and describe the types of users that will use the proposed system.]

Business Case
[Make sure to go through the why, what, how, and who that are necessary to decide if the project is worthwhile. Please use the SWOT Analysis applied on the system. You can also use a Fishbone diagram to explain the main problem you are trying to solve.]

principal activities and milestones

Work Breakdown Structure
[Insert the projects work breakdown structure.]

Project Schedule
[Identify and document the relationships among the project activities/tasks. You need to estimate the duration of each task. You also need to estimate the type and quantity of materials, human resources, equipment, or supplies required to perform each activity. The Gantt chart will be used to describe the schedule for external readers while the PERT chart (with the critical path analysis) will be used by the team.]

Visibility plan
[How will you keep in contact with the client and report progress? How will you communicate among your team?]

Project Features
[This project scope should be defined as clearly as possible. As systems analysts, you should limit the focus to the problem at hand and avoid unnecessary additions]
The features of the are as follows:
[Insert Objective 1]

[Insert Objective 2]

[Add additional bullets as necessary]

Assumptions, Constraints And Risks

Assumptions
1) [Insert description of the first assumption.]
2) [Insert description of the second assumption.]

3) [Add additional items as necessary]

Constraints
1) [Insert description of the first constraint.]

2) [Insert description of the second constraint.]

3) [Add additional items as necessary]

Risks

[You can describe the impact of the risk and its probability.]
1) [Insert description of the first risk.]
2) [Insert description of the second risk.]

3) [Add additional items as necessary]

Feasibility Study

[Please describe the operational, economic, technical and schedule feasibility.]

Project Roles and Responsibilities

Roles
[This section lists the people who will participate in the project, and describes each persons role. Please keep in mind that I will be acting as your client. Add rows to the table as necessary.]

Name

Project Role

Project Responsibilities



Responsibilities
[Please indicate the responsibilities and tasks done by each team member.]

Peer Evaluation
[Each team member evaluates the rest of the team members.]

APPENDIX A: REFERENCES
[Insert the name, description, and physical location of any documents referenced in this document. Add rows to the table as necessary.]
The following table summarizes the documents referenced in this document.

Document Name and Version

Description

Location

[Provide description of the document]

APPENDIX B: KEY TERMS

[Insert terms and definitions used in this document. Add rows to the table as necessary.]

The following table provides definitions for terms relevant to this document.

Term

Definition

[Insert Term]

[Provide definition of the term used in this document.]

[Insert Term]

[Provide definition of the term used in this document.]

[Insert Term]

[Provide definition of the term used in this document.]

Page 6 of 6

[Insert appropriate disclaimer(s)]

Leave a Comment

Your email address will not be published. Required fields are marked *