10 examples of projects and programs. Course: Advanced Construction please give 10 examples of projects and programs. Pictures and references are mu

10 examples of projects and programs.
Course: Advanced Construction

please give 10 examples of projects and programs.
Pictures and references are musts
Cite any work you copy

Don't use plagiarized sources. Get Your Custom Assignment on
10 examples of projects and programs. Course: Advanced Construction please give 10 examples of projects and programs. Pictures and references are mu
From as Little as $13/Page

Running Head: ADVANCED CONSTRUCTION 401 1

ADVANCED CONSTRUCTION 401 4

ADVANCED CONSTRUCTION 401

Examples of Projects and Programs
Dr. Swarnali Ghosh
Saleh Alfadhel
8/25/2020

In advanced construction, the architects need to understand the relationship between the project construction and the construction design. Both project construction and project design are achieved through integrated systems (Binh, 2018). The project design involves the creation of a new program used in the project or the creation of the project itself. Project construction is the process of putting the project design into reality. This is the actual implementation of the created project design (Son & Kim, 2019). This is a short essay that gives ten examples of projects and programs in advanced construction.
Examples of the construction projects include the green buildings, Top-Down Design of the Hospital Project and Bottom-up Design of a hospital project, Groundwater Pollution from a Landfill, the tie-back retaining wall, and the Steel Frame Supporting a Turbo-Blower. The projects were designed and constructed to meet specific purposes (Son & Kim, 2019). For example, the steel frame project was constructed to help in supplying the pressurized air in the steel mill. The pressurized air was meant to supply air to a blast furnace. The following is a picture of a steel frame supporting a turbo-blower.

Figure 1.0 Steel Frame Supporting a Turbo-Blower
The examples of programs used in the advanced construction include the system utility, the Naviswroks software, viewpoint spectrum, and the CoConstruct program. The engineers use these programs to help in coordinating different activities during the construction of a project. The core function of construction programs is to help the engineers to effectively manage their projects (Binh, 2018). For example, they use a system utility program to manage the parts of a construction. This is a software program installed in the engineers computers to provide them with the necessary information concerning the construction (Binh, 2018). The following is a picture showing a section of a system utility program.

Figure 1.3 Section system utility software in a computer system

References
Son, H., & Kim, C. (2019). Classification of major construction materials in construction environments using ensemble classifiers. Advanced Engineering Informatics, 28(1), 1-10. https://doi.org/10.1016/j.aei.2013.10.004
Binh, N. (2018). Applying Lean Construction to Construction Project. Advanced Materials Research, 834-836, 1976-1983. https://doi.org/10.4028/www.scientific.net/amr.834-836.1976 ADVANCED CONSTRUCTION

Assignment 1

Submitted By: Sultan Ibrahim

Date: 08/26/2020

Introduction
In planning an advanced construction, it is important to understand the relationship between a construction and a design. The two processes are best viewed as integrated systems (Thanh Binh, 2016). In advanced construction, the design is used to refer to the process of creating a description of a new project or a program. Construction on the other hand refers to the process of identifying the activities and resources required to make a design a physical reality (Thanh Binh, 2016). Therefore, construction involves the implementation of a design created by engineers and architects. This paper discusses ten examples of projects and programs that are under construction.
1. Steel Frame Supporting a Turbo-Blower

This project was designed to help in supplying pressurized air in the steel mill. Its main purpose is to supply the air to a blast furnace. The turbo-blower consists of a blower linked to an inlet stack that allows air in and the turbine (Thanh Binh, 2016). However, the major concern of the turbo-blower is vibration. This is what makes its operation possible.

Figure 1.0 Steel Frame Supporting a Turbo-Blower
2. Design of a tie-back retaining wall
A tie-back retaining wall is an example of projects that were built in the 1960s when such constructions were not very common. The projects of this kind pose a considerable risk to the engineer and the owner (Thanh Binh, 2016). Therefore, they pose a potential risk of financial losses from both litigation and remedial costs. However, retaining the wall failed which also led to the failure of the slope.

Figure1.1 Typical Cross Section of Hillside Adjoining Site
3. Groundwater Pollution from a Landfill
This is a project that is usually started to help in collecting the waste deposits in a potential construction. However, under the regulation in the United States, the owner of a facility is held responsible for any waste deposits from his project (Thanh Binh, 2016). This is the reason why most of the construction projects create this subproject for collecting waste deposits. This project is commonly known as a pushover dump which is commonly located in a depression on a slope.

Figure 1.2 Cross-Section Illustration of a Landfill
4. system utility

A system utility is software program that is used in advanced construction to help the engineers manage the different parts of the construction. It is usually installed in the computer systems of the engineers to provide them with all details of the construction (Thanh Binh, 2016). It allows them to manage the construction more effectively.

Figure 1.3 Section system utility software in a computer system
5. Navisworks Software Program

Navisworks is a software program used by the construction engineers to review their projects. It is mostly used to improve and coordinate the building information modeling (Shanthi, 2017). It is used to combine the construction data in one model and resolve the clash problems that may occur before construction.

Figure 1.5 A sample of navisworks software
6. Viewpoint Spectrum

Spectrum software is used in the construction project to help the engineers with enough information to completely manage the construction. It combines accounting, job costs, and other important data in a single based cloud application program (Son & Kim, 2019). It helps the engineers with service management information and equipment functionality management.

Figure 1.6 viewpoint spectrum
7. CoConstruct

This is project management software that is mostly used in advanced construction. The CoConstruct program is used to provide homebuilders with important tools to manage their projects. It helps the engineers with the best tools to manage the finances used in the construction as well as the clients (Son & Kim, 2019). Engineers use this software to sync data from the estimates, make changes on the orders through the use of QuickBooks and online services.

Figure 1.6 CoConstruct
8. Green buildings

Green building projects are also known as green construction. It refers to the project structure and the application processed (Thanh Binh, 2016). This is the type of advanced construction project that is environmentally responsible. It is a resource-efficient project through the life-cycle of the building project.

Figure 1.7 example of a green building project
9. Top-Down Design of a Hospital Project

This is a spatial layout project for a hospital. It is a functional construction model for hospitals in which several divisions of the project are shown schematically (Shanthi, 2017). This means that upon the completion of the project the hospital departments are situated down in a hierarchical manner.

Figure 1.8 top-down design of hospital design
10. Bottom-up Design of a hospital project

This is a multipurpose project that suite the hospital in a bottom-up style. The basic elements in this project are first organized into several zones making up the bottom room (Son & Kim, 2019). However, the bottom room is required to perform the desired services which are determined by a spatial layout. Finally, the entire hospital project design is defined by parts of the multipurpose examination suite.

Figure 1.9 Bottom-up design of a hospital project

References
Shanthi., J. (2017). Challenges Faced By The Construction Manager In The Construction Industry. International Journal Of Advanced Research, 5(7), 227-233. https://doi.org/10.21474/ijar01/4710
Son, H., & Kim, C. (2019). Classification of major construction materials in construction environments using ensemble classifiers. Advanced Engineering Informatics, 28(1), 1-10. https://doi.org/10.1016/j.aei.2013.10.004
Thanh Binh, N. (2016). Applying Lean Construction to Construction Project. Advanced Materials Research, 834-836, 1976-1983. https://doi.org/10.4028/www.scientific.net/amr.834-836.1976